PAST PROJECTS
Feasibility study (RPS Cairns)
Dates: August 2000 to June 2001
Lead organisation: Committee
Funding:
- £1500 Shell BBC
- £300 BTNM
- £100 PTA
- £100 fundraised
- £2000 WIE
Document: PDF (4.2MB)
Disclaimer: Please note that the drawing on p43 of this document
shows just one possible location for parking, and the final solution
will depend on where we can acquire some land.
It proved quite difficult to get funding for the feasibility study, but at last we managed it, with help from Shell Better Britain Campaign, BTNM, Iochdar School PTA, Western Isles Enterprise, and our own funding. The £4,000 project produced a very comprehensive document, including full drawings of all the proposals. These have formed the basis of most of our subsequent projects. The final document was available to the public at the annual show in 2001.